Asheville, North Carolina

Old houses,quietly made new

A small design-build studio. We draw your renovation, price it honestly, and build it with the same four people from demolition to the last coat of wax.

A renovated great room with morning light across the floor
Montford bungalow — kitchen and great room, completed spring 2025
Projects a year
Eight to ten
Design & build
Both in-house
Typical span
10–18 weeks
Warranty
5 years

Featured in

What we do

Three ways to work with the studio

Every one of them starts with drawings. We will not price a renovation we have not designed — it is how budgets stay honest.

Kitchens

01 — The room you actually live in

Kitchens

We start with how you cook, not with a catalogue. Custom cabinetry from a shop we have used for a decade, stone chosen at the slab yard with you, and lighting designed rather than sprinkled.

  • Custom local cabinetry
  • Slab selection together
  • Lighting design included
Talk about a kitchen
Baths & primary suites

02 — Small rooms, careful hands

Baths & primary suites

Waterproofing done properly and invisibly, tile set by one person start to finish, and storage that makes a small room feel deliberate rather than crowded.

  • Full waterproof assemblies
  • One tile setter per project
  • Radiant floors as standard
Talk about a bath
Whole-house renovation

03 — The long conversation

Whole-house renovation

Rethinking how the whole house works — moving walls, adding light, correcting a hundred years of well-meant changes. Drawn, permitted and built by the studio.

  • Structural changes & additions
  • Historic-district approvals
  • Phased so you can stay if possible
Talk about the whole house

How we work

Five unhurried steps

Nothing here is rushed, and nothing is decided for you.

  1. 01

    Conversation

    An hour at your kitchen table. What frustrates you, what you love, what you would never change.

    Free

  2. 02

    Design agreement

    Measured drawings, two or three schemes, and a real budget range before you commit to building.

    3–5 weeks

  3. 03

    Selections

    Slab yard, tile shop, hardware. We go with you and keep the running total visible the whole time.

    2–4 weeks

  4. 04

    Build

    The same small crew, every day, in a house they treat as yours. Friday photo updates.

    10–18 weeks

  5. 05

    Settling in

    We come back at one month and one year to adjust doors, touch up and check the work.

    Year one

Portfolio

A few houses we have loved

Each of these took months. We would rather show you four properly than forty as thumbnails.

Montford bungalow, Montford, Asheville

Whole house · Montford, Asheville · 2025

Montford bungalow

A 1921 bungalow opened to the garden. We removed the wall between kitchen and porch, rebuilt the chimney breast as a reading nook, and left every original trim profile intact.

Size
2,100 sq ft
Duration
16 weeks
Built
1921
Kenilworth kitchen, Kenilworth, Asheville

Kitchen · Kenilworth, Asheville · 2025

Kenilworth kitchen

Plaster walls, an unlovable galley, and a family who cooks every night. New window seat, quarter-sawn oak cabinetry and soapstone that will age with them.

Room
Kitchen
Duration
11 weeks
Cabinetry
Quarter-sawn oak
Grove Park primary suite, Grove Park, Asheville

Bath · Grove Park, Asheville · 2024

Grove Park primary suite

Two cramped bedrooms became one suite with a dressing room and a bath that gets the morning light. Radiant floors, zellige tile set by hand.

Rooms
3 into 1
Duration
13 weeks
Tile
Hand-set zellige
West Asheville cottage, West Asheville

Addition · West Asheville · 2024

West Asheville cottage

A 340 square foot addition that looks original — same roof pitch, salvaged brick, and a screened porch the family now uses eight months a year.

Added
340 sq ft
Duration
14 weeks
Brick
Salvaged local

Palette

The materials we keep coming back to

Not a house style — a set of things that age well in this climate and this light. Yours will be different, but it will start here.

  • Everything specified is something we have lived with on a previous job
  • Local suppliers wherever the lead time allows
  • Nothing chosen from a screen alone — samples come to your house
Lime plaster Walls, hearths
Quarter-sawn oak Cabinetry, floors
Soapstone Counters, sinks
Unlacquered brass Hardware, taps
Zellige Splashbacks, baths
Reclaimed heart pine Beams, shelving
Limewash Exterior brick
Blackened steel Rails, screens

Before / after

The same room, eleven weeks apart

Drag the handle. Same corner, same time of day.

Kenilworth kitchen, after
Kenilworth kitchen, before
Before After
Kenilworth kitchen Galley wall removed; window seat added where the back door used to be.
Grove Park suite, after
Grove Park suite, before
Before After
Grove Park suite Two bedrooms and a hall closet became one suite.

The studio

Four people, and that is on purpose

You will know all of us by name within a week. Nobody is handed off to a project coordinator you have never met.

Nora Ellis

Nora Ellis

Principal & Designer

Trained as an architect, spent six years on site before opening the studio. Draws every project herself.

Founded the studio, 2014

Ben Ellis

Ben Ellis

Build Lead

Twenty years of finish carpentry. Runs the site, sets the trim, and will not let a door hang badly.

20 years on the tools

Marisol Vega

Marisol Vega

Tile & Stone

Sets every tile on every project start to finish, which is why the lines actually line up.

12 years · Master setter

Theo Grant

Theo Grant

Client Liaison

Keeps the schedule, the selections and the running budget where you can see them.

Joined 2019

Investment

What projects like yours cost

Real ranges from the last two years of work in Asheville, not national averages. Design fees are credited toward construction when you build with us.

Single room

Typically$65k – $140k

One kitchen, one bath, or a room reworked properly with no structural changes.

  • Measured drawings & two schemes
  • Custom cabinetry
  • Selections support at the yards
  • Ten to twelve weeks on site

10–12 weeks

Start a conversation

Whole house

From$300k

Rethinking the entire plan, usually with an addition and a full mechanical replacement.

  • Full architectural set
  • Historic-district approvals
  • All new systems
  • One-month and one-year returns

6–11 months

Start a conversation

Ranges include our design work, permits, labour and mid-to-high finishes. Structural surprises in a hundred-year-old house are the one thing nobody can price in advance — we carry a written contingency and show you every dollar of it.

Clients

What it was like to live through

We interviewed four builders. Nora was the only one who asked how we actually use the kitchen before telling us what it would cost. Sixteen weeks later we have a house that feels like it was always this way.
Hannah & Pete L. Montford bungalow, whole house
They protected the original trim like it was theirs. That mattered more to me than anything else.
Grace T.Kenilworth kitchen
The running budget was visible the entire time. No envelope moments.
Daniel R.Grove Park primary suite
They came back a year later to adjust two doors nobody but Ben had noticed.
Sofia M.West Asheville cottage

Journal

Notes from the studio

What we are learning, specifying and second-guessing. Roughly monthly.

Why we stopped specifying lacquered brass

Why we stopped specifying lacquered brass

Six years of watching it wear unevenly in wet rooms changed our minds. What we use instead, and what it costs.

Read it
The hundred-year-old floor problem

The hundred-year-old floor problem

Every Asheville bungalow has a sloping floor. Here is how we decide whether to level it, and when levelling makes things worse.

Read it
What a design agreement actually buys you

What a design agreement actually buys you

A plain-language walk through the drawings, the budget and the two weeks of thinking that make the build boring — in the best way.

Read it

Questions

Asked at almost every kitchen table

Do you take on small projects?

Occasionally, but honestly not often — we take eight to ten projects a year and they tend to be full rooms or more. If yours is smaller we are glad to point you toward two builders we trust.

What does the design agreement cost?

Between $4,500 and $12,000 depending on scope. It buys measured drawings, two or three design schemes and a real construction budget — and it is credited toward the build if you go ahead with us.

Can we live in the house?

For a kitchen or a bath, usually yes, with a temporary setup and dust walls. For whole-house work most clients move out for the middle stretch. We will tell you honestly at the design stage.

How far ahead are you booking?

Design usually starts within four to six weeks of a signed agreement. Construction starts three to five months out, and the design phase fills most of that gap.

Do you work on historic homes?

Most of our work is pre-1940. We handle historic-district review and we know which original details are worth the extra week to save.

What happens if you find something behind the wall?

Every project carries a written contingency. When we open something up we photograph it, price the fix and show you the options before anyone touches it.

Where we work

Asheville and the surrounding valleys

We stay close so the crew is on site by eight and the studio can drop in unannounced.

Ask about your address
  • Asheville
  • Montford
  • Biltmore Forest
  • Weaverville
  • Black Mountain
  • Fairview
  • Hendersonville

Say hello

Tell us about your house

We take on eight to ten projects a year, so we start with a long conversation rather than a quick quote.

Project type

No spam, no drip campaign. We only use this to reply.