Structural concrete
Footings, foundation walls, columns, elevated decks and slabs. Gang forms, self-consolidating mixes, in-house pump.
- Up to 1,400 yd³ per pour
- ACI-certified finishers
- Cold-weather pours to 15°F
Commercial concrete, structural demolition and sitework. Every crew on this job is on our payroll — no broker, no daisy-chain of subs, no one to blame but us.
Scopes we self-perform
If it is on this list, our people are doing it. If it is not, we will tell you who should.
Footings, foundation walls, columns, elevated decks and slabs. Gang forms, self-consolidating mixes, in-house pump.
Selective interior strip-out through full structural take-down. Engineered shoring, dust and vibration monitoring, sorted recycling.
Mass excavation, underground utilities, stone base and compaction. Laser and GPS grade control on every machine.
Warehouse slabs, loading docks, paving and joint repair. F-number targets written into the contract, verified and reported.
By the numbers
Job log
Hover a line to see it. Everything here was self-performed.
Iron on the ground
Owned, not rented. That is why our start date does not move when a rental yard is short.
| Unit | Machine | Capacity | Use |
|---|---|---|---|
| 01 | Komatsu PC490 excavator | 49 t | Mass excavation, structural demo |
| 02 | High-reach demolition boom | 105 ft | Multi-storey take-down |
| 03 | Putzmeister 47Z boom pump | 47 m | Elevated deck pours |
| 04 | Laser screed | 20 ft | Warehouse slabs, FF35+ |
| 05 | CAT 745 articulated haulers ×4 | 41 t each | Site haul-off |
| 06 | Ride-on power trowels ×6 | 10 ft | Slab finishing |
Full equipment list and current certifications available on request for bid packages.
Method
The same sequence on a $200k slab and a $9M structure.
Quantities off your drawings, not a square-foot guess. Assumptions listed in writing.
Line-item proposal with the scope split spelled out — what is ours, what is not.
Shoring engineering, pour sequencing, traffic and dust plans submitted before mobilisation.
Our iron, our operators. Site fenced, monitored and swept daily from day one.
Daily reports with photos, quantities placed and tomorrow’s plan by 6pm.
Test results, as-builts and warranty package delivered inside ten days of final pour.
Who runs it
Superintendents average nineteen years here. You will meet them at the pre-con, not just in a bid book.
Owner / Estimator
Took over the company from his father in 2004. Still prices every job over $1M himself.
General Superintendent
Runs all nine crews and the pour calendar. If your date moves, she is the one who called you.
Demolition Superintendent
Engineered take-downs in tight urban sites. Has never had a lost-time incident on his crew.
Safety Director
Runs the toolbox talks, the audits and the drug program. Our EMR is his doing.
General contractors and owners we work under
References
They poured 212,000 square feet in eleven nights and hit every F-number. We did not have a single grinding day.
Hardline took down six storeys between two occupied buildings and we never got a call from the neighbours.
The daily reports are better than ours. Quantities, photos, tomorrow’s plan, every night by six.
Twenty-two months on a live plant campus, zero recordables, zero shutdowns we caused.
Coverage
We mobilise statewide for structures over $2M. Everything else stays inside this ring.
Bid questions
Five business days for anything under $5M, ten for structures. If your bid date is tighter, call and we will tell you honestly whether we can do it justice.
Everything on our scope list is self-performed with our own crews and our own iron. We do not broker concrete or demolition to anyone.
EMR is 0.71. All supervisors carry MIOSHA 30 and we run weekly documented toolbox talks. Full mod-rate letters go out with every bid package.
Yes. We pour to 15°F with blankets, heated enclosures and adjusted mixes, and we write the cold-weather protection into the price rather than as an extra.
Bonded to $12M single, $30M aggregate. Bonding company letter available on request.
Concrete is crushed and reused on site wherever the spec allows. We diverted 86% of demolition material last year and the tickets are in every close-out package.
Send drawings and addenda. You will get a real number with the scope split written out, not a placeholder.
Bid request
Plans, addenda, bid date. We turn commercial bids around in five business days and we do not disappear after award.